Old School Renovation
[Completed]
Old School Renovation
The works comprise the full renovation of the Old School which is located beside the Stenden University at Bin Omran Area.
Home » Maintenance
[Completed]
The works comprise the full renovation of the Old School which is located beside the Stenden University at Bin Omran Area.
[Completed]
The project includes the Renovation of the existing Main Mall and Squares, in addition to the creation of an entire New Mall with a series of smaller piazzas catered for a more high-end segment, connected by skywalk to Qatar Convention Centre and adjoining the new 5-star hotels Marriott Courtyard & Renaissance, Shangri-la and Merweb Grand City Centre.
[Completed]
The Al-Faisal Tower is a 52 Storys Building located in the West bay Area, Doha – Qatar. The Scope of the work includes fit – out works for Specified, Wall and Ceiling Works, Painting and decorative works, MEP Works etc. These high quality works are done time bound as per the client’s requirement. The Scope also includes Supply and installation of Ceiling works, suspension system, Painting & Decorating works, and MEP works. This challenging Project will place DTC among the leaders in the construction industry.
[Completed]
The West Food Court is Located in the 3rd floor of the City Center Shopping Mall in the West Bay Area. The renovation of west food court was done by providing high quality marble floorings, ceiling works, gypsum works, partition works, paintings and providing a completely new MEP system. West food Court is a special attraction to customers visiting City Center Shopping Mall.
[Completed]
The newly renovated Restrooms in the 3rd floor of City Center Doha is the part of the total renovation works carried out at city center. These superior quality rest rooms offer luxurious facilities. The old flooring has been replaced with new high quality marble with brass strips and the walls cladded with wooden panels and marble. The sanitary wares are equipped with motion sensors in order to reduce the consumption of water. To add convenience, an ablution area has been added next to the prayer room.
[Completed]
The new museum is located on the sixth floor of the Renaissance Hotel, in the heart of the West Bay business district. The museum houses a wide range of unique carpets, and other items; there are more than 1000 carpets from Iran, Turkey, India, Egypt and other countries dating from the 17th century up to the 20th century. The unique collection of ceramics includes examples from the Abbasid Caliphate and other periods renowned for the quality of their ceramic work. Among the items of furniture are antique Egyptian, Syrian and Iraqi pieces and from other Arab and Islamic countries.
[Completed]
This project is the extension of 5,780 m2 area to the existing 25 year old museum building. The perfect and composite construction with rough stone masonry and concrete (columns / beams & slabs) reveals the ancient and the traditional Arab architecture. The height of the structure and the arched wooden joineries reveals the Arab sculpture. The traditional mosaic and carpet flooring reveals a more traditional Qatar and brings back its cultural memories.
[Completed]
This Mosque built in Al Gharafa area has a total site extent of 4,065 sqm and Mosque built-up area of 1,471 sqm including a 26m high minaret. The external cladding has been done with stone using Islamic design and internal finishing with marble, painting, wooden decorative ceilings, doors and windows according to Damascus/Islamic design, centralized A/C and more. The building is furnished using high quality carpet imported from Holland.
[Completed]
The City Center Mall is the Largest Shopping mall situated in the heart of West bay. The renovation works to the ground floor and first floor of the existing mall with the introduction of a new 201,000 sqm mezzanine car parking floor constructed using steel structural and concrete laid on bondek as floor slab with integrated car park system. The scope includes enabling structural, strengthening, architectural MEP Works.
[Completed]
Broaster Restaurant project is located in the 3rd floor of City Center West Food Court. The Work includes HVAC ductwork with associated fittings and internal duct work hangers and supports to gather with the installation and wall tiles. The Restaurant Ceiling is Fire proofed Powder Coated aluminium Steel Clip – in tile on clip profile. The Floor is Water Proofed and installed with A grade tile. The Front Counter is built using high quality top with silver lining.